The mobile water and wastewater treatment solutions offered by Nijhuis Saur Industries Mobile Water Solutions (NSI MWS) are designed to meet all your treatment needs, whether to cover an on-site emergency or on a long-term contractual basis.

Our mobile units can be deployed to site at any time, for rental periods ranging from a few days to several years, and for a wide range of applications!

Here are some practical examples of the services we offer.

Emergency service

This fast and reliable service is designed to meet your critical and urgent needs in the event of an on-site plant failure or unforeseen event that threatens your continuity of operations.

  • Short-term needs
  • For unforeseen events
  • Deployment within 4 hours of your call, subject to your location and equipment availability

Case study: Additional demineralized water to meet fluctuating demand

Company/Sector Oil & Gas company
Country UK
Water requirements Additional demineralized water
Problem To find a solution flexible enough to meet fluctuating demand
Solution Multiple mobile deionization trailers MODI 15000T

Mobilization from the Stoke on Trent depot within 4 hours of the call

Customer benefits
  • Peace of mind :
    • Comprehensive maintenance and service included
    • Guaranteed production continuity

 

ReAct: guaranteed deployment within hours

ReAct is our “Treated Water Security” Plan.

Becoming a ReAct customer gives you the reassurance that the appropriate water treatment solutions will be deployed within four hours of your call to us.

This service also provides full compliance with the ISO 22301:2019 requirement to ensure appropriate water treatment capabilities as part of your business continuity plan.

Case study: Demineralized water for a car manufacturer

Company/Sector Multinational automotive manufacturer
Country UK
Water requirements Demineralized water
Problem A cracked cationic resin exchanger
Solution Supply of an emergency solution:

  • A mobile reverse osmosis (MORO 4×25T) double pass,
    achieving <8µS/cm conductivity
Duration 12,000 m³ of water over two weeks
Customer benefits
  • Rapid Response : On-site within 6 hours of your initial call
  • Uninterrupted Production : Ensure continuous operations during
    emergencies and on-site plant repairs

Planned cover

This service provides you with mobile treatment units to meet specific needs:

  • Plannedequipment maintenance and upgrades
  • Changes in feed water
  • Changing trends in treated water consumption
  • Asset commissioning
  • Low oxygen demand

Case study: Planned intervention to alleviate water shortage issues

Company/sector Petrochemicals: production of fertilizers, minerals, TiO2 and chemicals
Country Poland
Water requirements Demineralized water
Problems
  • The company was experiencing water shortages
  • Higher levels of salinity in autumn and winter
  • Insufficient production from the demineralization plant
  • Frequent resin regeneration
Solution Minimize salinity levels using:

  • 2 mobile reverse osmosis units (MORO4x25T)
  • 1 pre-filtration system
  • Buffer tanks
  • Pump skids, producing 200 m³ per hour with over 95% salinity reduction
Customer benefits
  • Peace of mind: NSI WMS managed system operation throughout the rental period
  • No downtime : Water treatment issues were resolved to maximize plant output

Case study: Increased production of ultrapure water for the pharmaceutical industry

Company/sector Multinational pharmaceutical manufacturer
Country Germany
Water requirements Ultrapure water
Problem
  • Higher production volumes driven by market growth
  • Insufficient water treatment capacity to meet USP, Ph Eur and ultrapure water quality standards
Solution NSI MWS provides the necessary resources to ensure a guaranteed supply ofultrapure water at 6 m³ per hour:

  • 2 skid-mounted mobile purified water units  (MOPW 4000S)
  • A new stainless steel piping network
  • 1 storage tank
  • Booster pumps
  • Pharmaceutical-grade flexible hoses
Duration 5-month contract
Customer benefits
  • Flexibility: “Pay as you go” contract
  • Rapid Response : Installation fully operational within just 2 weeks
  • Cost Savings: No need to purchase equipment

Multi-year agreement

Our multi-year service offers reliable, adaptable, and cost-effective solutions to meet your long-term treated water needs for up to 7 years.

Reasons to choose this type of contract

  • Limited CAPEX
  • Production life cycle uncertainties
  • The installation is required for less than 10 years
  • You need to reduce your operating costs
  • The volume of treated water you need is increasing
  • You need to replace existing installations
  • You need to boost plant reliability
  • You need to reduce your raw water costs

Case study: Reliable, long-term contract for an oil refinery

Company/sector One of Germany’s largest oil refineries
Country Germany
Water requirements Stable, reliable production of demineralized water
Problem
  • Addressing condensate return quality issues
  • Unable to wait for the next scheduled maintenance shutdown in three years
Solution  

  • 2 pre-filtration units (MOFI 3×80)
  • 1 mobile filtration unit (MOFI 12×18)
  • 1 mobile reverse osmosis trailer (MORO 4x25T)
  • 1 mobile degasser (MODA 100)
  • 1mobile pump (MOPS 170i)
  • 2 mobile ion exchange trailers (MODI 15000T)
Duration 3 year contract
Customer benefits
  • Peace of mind: Weekly service inspections by NSI MWS technicians; quality and quantity guaranteed.
  • No Production Downtime: Continuous operation 24/7